|
| image = | image_width = 265px | image_alt = | caption = | type = Rapid transit | system = Suzhou Rail Transit | status = In operation | locale = | start = first phase terminal station Suzhou North Railway Station | end = first phase terminal station Baodaiqiao South | stations = total 35 stations, first phase are 22 stations (6 Elevated Stations, 16 Underground Stations), second phase are 13 stations. | routes = | ridership = | open = | close = | owner = Suzhou Rail Transit Co., Ltd | operator = Suzhou Rail Transit Co., Ltd | character = Elevated and Underground | depot = | stock = | linelength = 26.557km (16.502mi) | tracklength = 79.2m | notrack = 2 | gauge = | el = overhead wire | speed = | elevation = | website = | map = | map_state = collapsed }} Line 2 is the main north-south line of Suzhou Rail Transit. The length of first phase is 26.557 km, among them, 6.57 km is elevated, 19.146 km is underground and 0.67 km is open wide. The line's first phase started from Suzhou North Railway Station(高铁苏州北站) and ended in Baodaiqiao South Station(宝带桥南站) near Baodai Bridge(宝带桥). The line goes across five districts of Suzhou, including 22 stations(17 underground, 5 overhead). The first phase part will start operation in December 28, 2013. ==Stations== 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Line 2, Suzhou Rail Transit」の詳細全文を読む スポンサード リンク
|